Discover the latest government tenders related to "pedestrian subway". Start bidding or explore joint venture (JV) partnerships through TenderKings expert support.
Bengaluru - Sampige Road Sec : Sw I : Proposed Construction Of Pedestrian Subway At Km 12/900 -13/000, Size 1x5.0x2.65m, By Launching Method. Sw Ii : Proposed Construction Of Pedestrian Subway At Km 14/300-400, Size 1x5.0x2.65m, By Launching Method. Maintenance Period Is 6 Months...
Bengaluru - Sampige Road Sec : Sw I: Proposed Construction Of Limited Height Subway At Km 63/600-700, Size: 1x5.0x3.15m By Launching Method.sw Ii: Proposed Construction Of Pedestrian Subway At Km 67/200-300 Of Size: 1x5.0x2.65m By Launching Method. Maintenance Period Is 6 Months ...
Bengaluru - Sampige Road Section : Sw I : Proposed Construction Of Pedestrian Subway At Km 1/300-400, Size 1x5.0x2.65m, By Air Pushing Method. Sw Ii : Proposed Construction Of Pedestrian Subway At Km 45/600-700, Size 1x5.0x3.15m, By Air Pushing Method. Maintenance Period Is 6 Mon...
Bengaluru - Sampige Road Sec : Proposed Pedestrian Subways To Facilitate Crossing Of Railway Alignment By Cattle, Pedestrians And Smaller Vehicles In Various Locations As Rcc Box Size 1x5mx2.65m In Connection With Speed Increase Upto 130 Kmph (total Number Of Subways = 11 Nos) - ...
Construction For Development Of Pedestrian Subway At Nagerjala Trisection Agartala In Epc Mode Under Uidf Phase2 Including Defects Liability Period Of Eighteen Months
TenderKings helps businesses search and apply for government tenders across India. We specialize in Joint Venture (JV) support, sub-contractor onboarding, and vendor registration for sectors like civil works, IT, road construction, and infrastructure development. Use our smart filters to explore live tenders and find the right JV opportunities tailored to your business needs.