Execution Of P.way Works 1) Complete Track Renewal (primary) Of Existing 60 Kg 90 Uts Rail On 60kg Psc-14 Sleeper With New 60 Kg 90 Uts Rails On 60kg Wide Based Sleepers For A Length Of 0.773 Tkm From Km.1.217 To Km.1.99 Uni Line Between Vskp-ncc Under Aden/myd/wat,2) Through Sleeper Renewal (primary) Of Existing Psc 60 Kg Sleepers With New Wide Based 60 Kg Sleepers Along With Deep Screening And Raising Of Ballast Cushion For A Length Of 2.837 Tkm Scmn-gpt (by-pass) From Km.0 To 1.322- Dn Line & Km.1.217 To Km.1.99 Uni Line Between Vskp-ncc Under Aden/track/wat.3) Through Turnout Renewal Ttr(cs+cmsc)-10 Sets Under Aden/myd On Wmy Line.4) Through Turnout Renewal -25 Sets - Ttr(cs)-11 Sets & Ttr(cmsc)-14 Sets In Various Sections Of Waltair Division 5) Through Turnout Renewal Ttr(tfr)-39 Sets (1 In 12-6 Sets And 1 In 8% 33 Sets) Under Sr.den/south/wat.