1) S&t Portion Of Work In Connection With Proposed Rebuilding Of Bgml Loading Standard Girder Of Br.no.1383 Up In Dsi-pdu Section On The Basis Of Residual Fatigue Life Criteria For Running 25 T Axle Load Wagons @ 100 Kmph For Achieving Mission 3000 Mt - Railway Bridge Works. 2) S&t Portion Of Work In Connection With Proposed Replacement Of Bgml Loading Standard Girder Bridges Br.no.784 Dn Bet Snm-vbl And Br.no.836 Up Bet Vbl-dnv In Rgda-vzm Section On The Basis Of Residual Fatigue Life Criteria For Running 25 T Axle Load Wagons @ 100 Kmph For Achieving Mission 3000 Mt - Railway Bridge Works. 3) S&t Portion Of Work In Connection With Proposed Replacement Of Existing Steel Girders Of Span 12.20 Mtr By Psc Slabs On Br. Nos.1666up, 1666dn, 752s/l, Vsp8up, Vsp8dn, Vsp14up, Vsp14dn, Vsp24up, And Vsp25up And 1652 Siding On Main Line And Waltair Myd Lines. 4) S&t Portion Of Work In Connection With Rebuilding Of 8 No Minor Bridges Into Rcc Box Bridges Between Psa - Vzm On Main Line. Bridges: 1217a Dn, 1225 Up, 1302 Dn, 1481 Up, 1481 Dn, 1408 Up, 1435 Up And 1443 Up. 5) S&t Portion Of Work In Connection With Proposed Replacement Of Girders Of Major Bridge No.1383 Dn (bgml) In Psa-vzm Section In Connection With Mission 3000 Mt On The Basis Of Residual Fatigue Life Criteria Of Bridges Of Age More Than 50 Years Old & Bridges On More Than 40 Gmt.