Tender Details — Construction Of Two Lane Bridge Across Mahisagar River On Gj Sh-...

ROAD AND BUILDING DEPARTMENT • Vadodara, Gujarat

WhatsApp
Overview 3w and 5d from now left
High-level tender details
Tender AuthorityROAD AND BUILDING DEPARTMENT
LocationVadodara, Gujarat
Estimated Value₹ 1,755,778,617.25
EMD₹ 17,558,000.00
Document Cost₹ 18,000.00
Need a JV Partner?
Tender Description

Construction Of Two Lane Bridge Across Mahisagar River On Gj Sh-11, Gotri-sevasi-sindhrot Road Km. 8/800 To 9/400 Dist. Vadodara

Premium JV Support
Only 27 days left to bid
JV for this Tender

Faster paperwork • Compliant docs • Right partners

Compact JV pack: MoU + compliance + roles + timelines — delivered against your bid deadline.

Custom JV Agreement & MoU
PQC & compliance paperwork
Workshare & risk allocation
Fast turnaround
We align delivery to your deadline (28-Sep-2026).
JV Essentials Checklist
  • Lead & Partner credentials (experience, turnover)
  • Profit share / Workshare matrix
  • Board/Partner resolutions & authorizations
  • JV Agreement / MoU (stamp & notarization)
  • Bid-specific annexures & declarations
Compliant Docs
Fast Turnaround
Dedicated Expert
Items Total Items : 47 | Total Qty : 218941.9
List of items to be supplied
Sr. NoItem DescriptionQtyUnit
1 Carry out complete alignment survey work by total station along bridge alignment, cross roads 100m. both sides, 200m. additional length from both ends of bridge including marking of centre line of alignment, taking ground level details of existing structures, details of all manholes, catchpits, pipeline, valves, light poles, trees, over head electrical lines, BSNL section pillar/box, Torrent electrical boxes, PMT including number marked on them, road dividers, foot paths, etc.within construction area and additional areas/lengths if required. Rateincludes fixing necessary reference pillars, establishing bench mark, establish foundation layout on ground, including submissionlongitudinal section, cross section and drawing report of survey work in three hard colour copies with soft copy in CD to Engineer-in-charge as directed for flyover and approaches. Submission of drawing in hard copy and soft copy as per specifications. 1.900 Hect.
2 Carryout Geotech investigation work including drilling 150 mm dia bore holes in all sorts of soil, ordinary rock and hard rock, upto maximum depth as mentioned, collectig undisturbed samples and conducting standard penetration tests alternate at an interval of 1.5 to 2.0 m depth, conducting all necessary laboratory tests as per IRC provision, showing bore log locations, their RL of GL, for all type of classification and determination of soil parameters, including submission of report in three copies covering investigation data and recommendation for SBC & providing all parameters as per IRC considering the design criteria, all as per specification, as and where required and as per instruction of engineer in charge1) The rate is inclusive of submitting soil investigation report in three sets in hard copy as well soft copies duly signed by soil expert and contractor 2) The rate is inclusive of all materials with contractor\'s labour, tools and plants, machineries, as required. 550.000 Rmt
3 Providing temporary barricade including all road safety devices on both sides of bridge and arrangement for traffic diversion such as traffic signals, traffic marshals during construction at site, for day and night as per technical specifications and drawings. Temporary barricade shall be of plain MS sheet 1.5mm thick fixed with steel frame as per drawing, painting (including primer of approved quality) with synthetic enamel paint of approved color, quality and including maintenance of the same duly cleaning the same on fortnightly basis and painting as required, arrangement for blinker lights on barricades during night as per requirement and as per the instruction of the engineer. Barricading should be rugged. During the construction, barricading has to be kept continuously. Nothing extra will be paid for dismantling and re-erecting the barricades for other location of bridge and for the purpose of road widening / diversion / resurfacing, utility identification/diversion etc. There should not be any opening at the end of barricade except at locations approved by Engineer. Note: (i) Barricades on either side shall be measured individually. (ii) Once barricade has been provided and work started, removal of barricade will not be permitted till completion of pile, pile cap, pier and pier caps, portal beams, segment erection, I girder, erection, till completion of entire superstructure.(iii) While erecting barricade, the bottom gap between barricade and road should be plugged with cement concrete from inside, where required. (iv) There should be minimum openings at the end of barricade to allow access of trucks / lorries and machine to site work area. Even these spacing should have proper opening & closing arrangements. (v) For 2.0m barricades adequate blinking lights on barricade during night time must be ensured. The cost of this item should include provision for power pack / Genset etc. so as to ensure the blinking of lights in night time as long as barricades are in position at the work spot. (vi) After completion of the entire work, the barricades shall be the property of the contractor. (vii) If the cleaning is not done including removal of posters regularly, a recovery shall be made at the rate of 0.1percent of the accepted rate of item per fortnight on prorata basis of length not cleaned.(viii) The rates should be all inclusive for shifting/erecting/re-erecting the barricade for utility diversion / identification & road widening / diversions. (ix) The barricading shall be provided as per Item, Specification, Drawing, only. Any type of change / modification will not be allowed without written permission of Engineer In charge, and in such case rate reduction will be imposed based on allowed barricading with written permission for specific area with valid reason. (x) Barricading of height 2.0m height as per tender drawing. Payment shall be made at 70percent on erection of barricade and 30percent on removal of barricade as per the instructions of Engineer.(xi) It is specifically highlighted that barricading provided during construction shall be limited to 1m to 2m from outer edge of structure to be constructed. Barricading of height 2.0 m height as per GFCD. Payment shall be made at 70percent on erection of barricade and 30percent on removal of barricade after completion of project as per the instructions of Engineer. 2850.000 Sqm
4 Dismantling the existing structure including removing and stacking the dismantled materials as and where directed. - RCC Work (RCC Structures including cleaning, straightening and cutting of bars and seperating them out from RCC) 50.000 Cum
5 Dismantling the existing structure including removing and stacking the dismantled materials as and where directed. - Dismantling Rubble masonary / Brick work 25.000 Cum
View more BOQ items
Key Dates
Tender timeline
Publish Date Thu 27th August, 2026
Bid Submission Deadline Mon 28th September, 2026
Bid Opening Refer Documents
Documents
Official tender documents
Document NameAction
Tender Notice
FAQs

Sign up, download the bid documents, and submit as per the Key Dates. Need help? Talk to an expert.

Yes—JV MoU, compliance, share matrix, and end-to-end guidance. Start here.

We can help with PQC, technical compliance, and pricing strategies. Enquire now.
Have questions about TKID 20909698?
WhatsApp