Supply Of Servicingrepairing Of 1000 A Air Circuit Breaker,revival Healthiness Of Control Circuit Of Air Circuit Breaker,modification Of Input And Output Terminal Of Air Circuit Breaker,earth Exavation For Cable Unlaying 10 Meter In Length And 1 Meter In Depth,transportation Loading Unloading Of Air Circuit Breaker And Panel,installation Of 03 No. Psr Including Material,work Of Salvage Laying Lt Cable 400mm,work End Termination 1cx400 Mm2,erection Of 0.4 Kv Incomer Module,retrofitting Works Panel Interconnection,recover And Recoupe Of Old And Used Frame,fencingnbarricading Of Transformer At Etp Jharianala,replace Ruined Wiring Damaged Power Contactor,installation Of 06 No. 250a Hrc Fuse With Base Including Material,installation Of Three Phase 0.4kv 250a Overload 02 No.