Providing Alternate Power Supply To 132/33kv Ss Adurupalli By (i) Erection Of 9.35km 132kv Multi Circuit Lilo Line (1 No. 2 Ph Ckt & 1 No. 3 Ph Ckt) To 132/33kv Ss Rapur From 132kv Sc Railway Traction Feeder From 132/33kv Ss Adurupalli To Rtss Adurupalli (at Nearest Cut Point From Rtss Adurupalli) And Stringing Of 3rd Conductor (18.89km) From Lilo Point To 132/33kv Ss Adurupalli By Utilizing The Existing Towers (loc.no.1 To Loc.no.65) Of The 132kv Adurupalli -132kv Rtss Feeder (ii) Erection Of 2 Nos. 132kv Bay Extensions At 132/33kvss Rapur (iii) Erection Of 1no. 132kv Bay Extension And Replacement Of Existing 132kv Single Acsr Zebra Conductor Bus With Twin Acsr Moose Conductor At 132/33kvss Adurupalli In Nellore District