Tender Details — Supply Of Towel Rail,copper Alloy Taps/stop Valves (v2) Conformi...

INDIAN ARMY • Multi city, Multi State

WhatsApp
Overview 3w and 6d from now left
High-level tender details
Tender AuthorityINDIAN ARMY
LocationMulti city, Multi State
Estimated Value₹ Refer Documents
EMD₹ Refer Documents
Document Cost₹ Refer Documents
Need a JV Partner?
Tender Description

Supply Of Towel Rail,copper Alloy Taps/stop Valves (v2) Conforming To Is 8931,copper Alloy Taps/stop Valves (v2) Conforming To Is 8931,copper Alloy Taps/stop Valves (v2) Conforming To Is 8931,copper Alloy Taps/stop Valves (v2) Conforming To Is 8931,copper Alloy Taps/stop Valves (v2) Conforming To Is 8931,connector Pipes For Washbasins/ Sinks/ Geyser,bathroom Or Toilet Mirror (v3),plastic Seats And Covers For Water - Closets As Per Is 2548,ceramic ( Vitreous China ) Flushing Cisterns For Water Closets And Urinals Conforming To Is 774,bathroom Water Shower (v2),bathroom Water Shower (v2),flexible Drain Hoses For Wash Basins/ Sinks,stainless Steel Shelf Rack,bathroom Or Toilet Mirror (v3),aluminium Tower Bolt 200 Mm,aluminium Tower Bolt 150 Mm,aluminium Sliding Bolt 300 Mm,aluminium Handle 125 Mm,aluminium Handle 150 Mm,butt Hinges 75 Mm,butt Hinges 100 Mm,door Closer,door Stopper,wire Mesh Mosquito Proof,curtain Rod,curtain Rod Bracket,curtain Rod End Rollers,rat Rail,plywood 6 Mm 6x4,plywood 12 Mm 6x4,nails All Size,fev

Premium JV Support
Only 28 days left to bid
JV for this Tender

Faster paperwork • Compliant docs • Right partners

Compact JV pack: MoU + compliance + roles + timelines — delivered against your bid deadline.

Custom JV Agreement & MoU
PQC & compliance paperwork
Workshare & risk allocation
Fast turnaround
We align delivery to your deadline (27-Aug-2026).
JV Essentials Checklist
  • Lead & Partner credentials (experience, turnover)
  • Profit share / Workshare matrix
  • Board/Partner resolutions & authorizations
  • JV Agreement / MoU (stamp & notarization)
  • Bid-specific annexures & declarations
Compliant Docs
Fast Turnaround
Dedicated Expert
Key Dates
Tender timeline
Publish Date Tue 28th July, 2026
Bid Submission Deadline Thu 27th August, 2026
Bid Opening Refer Documents
Documents
Official tender documents
Document NameAction
Tender Notice
FAQs

Sign up, download the bid documents, and submit as per the Key Dates. Need help? Talk to an expert.

Yes—JV MoU, compliance, share matrix, and end-to-end guidance. Start here.

We can help with PQC, technical compliance, and pricing strategies. Enquire now.
Have questions about TKID 20525113?
WhatsApp