Supply Of Supply Of 240v Ac, Single Phase, 5kva Ups As Per Attached Technical Specifications- Item Number-1,installation And Commissioning Of The New Ups Including Removal And Shifting Of The Existing Ups- Item Number-2,type Testing Or Emc Qualification Charges. If Required- Item Number-3,seismic Test Charges. If Required- Item Number-4,charge For Iv And V Independent Verification And Validation- At Factory. If Required- Item Number-5,est Test Charges. If Required- Item Number-6,reliability Analysis Charges. If Required- Item Number-7,supply Of Ups Used For Type And Seismic Testing Which Completed All Testing Satisfactorily At Factory. If Required- Item Number-8,training Charges- Item Number-9,supply Of Mandatory Spares I.e List Of Mandatory Spares Specified In Specification Clause 6.12- Item Number-10,charge For Iv And V Independent Verification And Validation At Site- Item Number-11