| Tender Authority | Directorate General of Lighthouses and Lightships |
|---|---|
| Location | Multi city, Multi State |
| Estimated Value | ₹ 767,056.00 |
|---|---|
| EMD | ₹ 16,000.00 |
| Document Cost | ₹ Refer Documents |
Supply Of Supply And Installation Of Fr163a 4p 415v Ac On Load Manual Change Over Switch Disconnector With Ss Encloser Extended Handle 3 Point Change Over I, 0 And Ii,supply And Installation Of 16sq.mm X 4 C Copper Armored Xlpe, 1.1kv Lt Cable As Per Is7098 Part I,supply And Installation Of 16sq.mm X 4 C Pvc Insulated Flexible Sheathed Copper Cable As Per Is694,excavation For Cable Trenches 0.3m Wx0.3m Hx40m L Total 3.6cum,supply And Installation Of 4 Pole 40a 415v Mcb For 3 Phase Genset Supply From Pump House To Guest House,supply And Installation 4 Way Mcb Distribution Board At Pump House For 3 Phase Genset Supply Tapping,miscellaneous Material
JV for this Tender
Faster paperwork • Compliant docs • Right partners
Compact JV pack: MoU + compliance + roles + timelines — delivered against your bid deadline.
JV Essentials Checklist
- Lead & Partner credentials (experience, turnover)
- Profit share / Workshare matrix
- Board/Partner resolutions & authorizations
- JV Agreement / MoU (stamp & notarization)
- Bid-specific annexures & declarations
| Publish Date | Thu 22nd January, 2026 | Bid Submission Deadline | Thu 12th February, 2026 |
|---|---|
| Bid Opening | Refer Documents |
| Document Name | Action |
|---|---|
| Tender Notice |