Tender Details — Supply Of Preamplifier Assembly,temperature Control Assembly,dec...

GAIL(INDIA)LIMITED • Multi city, Multi State

WhatsApp
Overview 5d and 6h from now left
High-level tender details
Tender AuthorityGAIL(INDIA)LIMITED
LocationMulti city, Multi State
Estimated Value₹ Refer Documents
EMD₹ Refer Documents
Document Cost₹ Refer Documents
Need a JV Partner?
Tender Description

Supply Of Preamplifier Assembly,temperature Control Assembly,decoder Assembly,power Supply, Accpaian Model 20eb40,valve Driver Board,pca Termination Board,repair Kit For 6 Port Valve,1 16 Nut,1 16 Ferrule,1 16 Back Ferrule,six Port Valve Torque Bolt Gc Spares - Bolt Hh 5 16 24 X,gc Spares - Washer Flat Steel,tubing 316ss 1 16 Od 0.043 Id - Per Foot,six Port Valve,sample Shutoff Valve,diaphragm Shut Off Valve,thermoster Set, 9k With Seals,assy,temperature Sensor,dual Temp. Control,assy, Thermocouple, Dual Temp Control,coloumn Set - 4 Minutes,preheater Coil Carrier Loop,preheater Coil Sample Loop,soleniod Valve, 4-way Allenair, Helium Tight,pressure Switch,carrier Dryer,1 8 Block Valve,element Of Nipro Filter,nipro Filter,kit Of 5 Elements For 101 Genie Filter,genie Filter -101,kit Of 5 Elements For 120 Genie Filter,100-900 Sccm Bypass Rotameter,soleniod Valve, 3-way Asco, Stream,valve, Reg, 316 Ss, Ss-ss2-a,thermal Insulation,115 230 Vac Power Supply Board,cpu Board Upgrdation Kit,transient Suppressor Module Pca Quad Di

Premium JV Support
Only 6 days left to bid
JV for this Tender

Faster paperwork • Compliant docs • Right partners

Compact JV pack: MoU + compliance + roles + timelines — delivered against your bid deadline.

Custom JV Agreement & MoU
PQC & compliance paperwork
Workshare & risk allocation
Fast turnaround
We align delivery to your deadline (19-Oct-2026).
JV Essentials Checklist
  • Lead & Partner credentials (experience, turnover)
  • Profit share / Workshare matrix
  • Board/Partner resolutions & authorizations
  • JV Agreement / MoU (stamp & notarization)
  • Bid-specific annexures & declarations
Compliant Docs
Fast Turnaround
Dedicated Expert
Key Dates
Tender timeline
Publish Date Mon 12th October, 2026
Bid Submission Deadline Mon 19th October, 2026
Bid Opening Refer Documents
Documents
Official tender documents
Document NameAction
Tender Notice
FAQs

Sign up, download the bid documents, and submit as per the Key Dates. Need help? Talk to an expert.

Yes—JV MoU, compliance, share matrix, and end-to-end guidance. Start here.

We can help with PQC, technical compliance, and pricing strategies. Enquire now.
Have questions about TKID 21355523?
WhatsApp