Supply Of Excavation In Trenches N Exc 1.5 M Wide N Exc 1.5 Mtr Deep In Soft Lose Soil For Of Ci Pipe Line Complete All As Directed.,returning Filling In Including Spreading Leveling Watering Well Ramming In Layers N. Exc 25 Cm Thick Complete All As Directed.,removal Of Excavated Soil To A Distance Not Exc 50 M And Depositing Where Directed At A Level Not Exc 1.5 Mtr Complete All As Directed.,taking Up Ci Di Water Main Incl All Fitting Of 100 Mm Bore For Relaying Rerouting Of Serviceable Pipe After Cleaning Complete All As Directed.,m L Di Pipe Of 100 Mm Bore With Spigot And Socket End Rubber Gas Cate Joint Rate .,m L Di Pipe Of 150 Mm Bore With Spigot And Socket End Type Centrifugally Cast Class K 7 0 Complete All As Directed.,taking Up Or Down 80 Mm Bore Steel Tubing And Connection Including Cleaning For Relaying Or Complete All As Directed.,all As Per Here In Above But Bore Of Pipe 50 Mm.,all As Per Here In Above But Bore Of Pipe 40 Mm.,all As Per Here In Above But Bore Of Pipe 25 Mm,relaying Re Fixing Old 80 Mm Bor