Supply Of Excavate Foundation Pit In Softloose Soil, Not Exceeding 1.5 M Deep, 10 M2 On Plan,provide And Lay Plain Cement Concrete 1 4 8 With 40 Mm Graded Stone Aggregate, 100 Mm,sand Filling Under Floors Or In Foundations Including Watering And Consolidation,bore 300 Mm Diameter Pile Holes In Soil To 6 M Depth Including Setting Out Excavation,provide And Place M15 Concrete 1 1 5 3 With 20 Mm Aggregate In Pile Shafts Including Compaction And Curing Boring Reinforcement And Bulb Concrete Extra As Approved,supply, Cut, Bend And Fix 4 Nos. 20 Mm Tmt Bars Per Pile, Including Anchorage, Binding Wire And Securing. Excludes Pile Cap, Column And Beam Steel.,supply, Cut, Bend And Fix 8 Mm Tmt Rings At 125 Mm Centres In Pile Cages, Including Hooks And Binding Wire. Excludes Column And Beam Links.,provide And Place M15 Concrete 1 1.5 3 With 20 Mm Aggregate In Pile Caps Including Mixing Vibration And Curing Reinforcement And Formwork Measured Separately,provide And Place M15 Concrete 1 1 5 3 With 20 Mm Aggregate In 800 X 800 Mm Co