Tender Details — Supply Of Copper Alloy Taps/stop Valves (v2) Conforming To Is 89...

INDIAN ARMY • Multi city, Multi State

WhatsApp
Overview 1w and 10h from now left
High-level tender details
Tender AuthorityINDIAN ARMY
LocationMulti city, Multi State
Estimated Value₹ Refer Documents
EMD₹ 41,850.00
Document Cost₹ Refer Documents
Need a JV Partner?
Tender Description

Supply Of Copper Alloy Taps/stop Valves (v2) Conforming To Is 8931,curtain Pipe, Sider And Mounting Bracket,hydraulically Regulated Door Closers Conforming To Is 3564,rotational Moulded Polyethylene Water Storage Tanks (v3) Conforming To Is 12701,rotational Moulded Polyethylene Water Storage Tanks (v3) Conforming To Is 12701,copper Alloy Taps/stop Valves (v2) Conforming To Is 8931,copper Alloy Taps/stop Valves (v2) Conforming To Is 8931,s.s Wire Cloth 0.36mm Dia Wire 0.9m Wide X 15m Long,ss Wire Cloth 0.36mm Dia Wire 1.2m Wide X 15m Long,hdpe 40mm Pvc Pipe,cushion For Couch Long Piece,3mm Thick Apo Membrane,curtain Rod Bracket Decoralive Type 25mm,cushion For Sofa Set Fd-281,hat And Coat Hooks,wooden Glass Beading,bitumen Strip 50mm Wide X 5mtr Long,cushion For Easy Chair 20x20x2 Inches,cushion For Couch Small 20x21x4 Inches,pvc Gully,screw Wood 8x25 Mm Gl,screw Wood 8x40 Mm Gl,gi Clamp For 20 Mm Gi Pipe,screw Wood 6x20 Mm Gl,gi Clamp For 15 Mm Gi Pipe,silicone Tape,gi Long Scew 20mm X150mm,gl Check Nut Of Size 20mm,f

Premium JV Support
Only 8 days left to bid
JV for this Tender

Faster paperwork • Compliant docs • Right partners

Compact JV pack: MoU + compliance + roles + timelines — delivered against your bid deadline.

Custom JV Agreement & MoU
PQC & compliance paperwork
Workshare & risk allocation
Fast turnaround
We align delivery to your deadline (28-Mar-2026).
JV Essentials Checklist
  • Lead & Partner credentials (experience, turnover)
  • Profit share / Workshare matrix
  • Board/Partner resolutions & authorizations
  • JV Agreement / MoU (stamp & notarization)
  • Bid-specific annexures & declarations
Compliant Docs
Fast Turnaround
Dedicated Expert
Key Dates
Tender timeline
Publish Date Wed 18th March, 2026
Bid Submission Deadline Sat 28th March, 2026
Bid Opening Refer Documents
Documents
Official tender documents
Document NameAction
Tender Notice
FAQs

Sign up, download the bid documents, and submit as per the Key Dates. Need help? Talk to an expert.

Yes—JV MoU, compliance, share matrix, and end-to-end guidance. Start here.

We can help with PQC, technical compliance, and pricing strategies. Enquire now.
Have questions about TKID 19179179?
WhatsApp