Tender Details — Supply Of 12 Core Sm Optical Fiber Cable Armoured,4 Twisted Pair...

MINISTRY OF DEFENCE • Multi city, Multi State

WhatsApp
Overview Bidding closed
High-level tender details
Tender AuthorityMINISTRY OF DEFENCE
LocationMulti city, Multi State
Estimated Value₹ Refer Documents
EMD₹ Refer Documents
Document Cost₹ Refer Documents
Need a JV Partner?
Tender Description

Supply Of 12 Core Sm Optical Fiber Cable Armoured,4 Twisted Pair Copper Cable,single Io Box With Smb Shutter Facility,2 Port Io Box With Smb Shutter Facility,cat 6 Utp Network Connecting Cable-1,cat 6 Utp Network Connecting Cable -3,rj 45 Connector,sfp Module 10 Gigabit,sc-lc Fibre Patch Cord Single Mode,24 Port Liu Fully Load Rack Mount,hide Pipe 32 Mm,pvc Pipe 1 Inch,pvc Pipe 2 Inch,casing And Capping 1 Inch,utp Patch Jack Panel 24 Port,cable Manger,1.5 Sq. Mm 3 Core Cables,power Accessories Bends Screws Tags Clamps Flexible Pipes Royal Plugs Ext,digging Of Hard Soil 3ft Depth,laying Of Hide Pipe,laying Of Optical Fiber Cable,laying Of Pvc Cappingand Casing,laying Of Utp,single Mode Optical Fiber Cable Splicing,otdr Testing,fixing Of Io Box,fixing Of Jack Panel

Premium JV Support
JV for this Tender

Faster paperwork • Compliant docs • Right partners

Compact JV pack: MoU + compliance + roles + timelines — delivered against your bid deadline.

Custom JV Agreement & MoU
PQC & compliance paperwork
Workshare & risk allocation
Fast turnaround
We align delivery to your deadline (29-Jun-2026).
JV Essentials Checklist
  • Lead & Partner credentials (experience, turnover)
  • Profit share / Workshare matrix
  • Board/Partner resolutions & authorizations
  • JV Agreement / MoU (stamp & notarization)
  • Bid-specific annexures & declarations
Compliant Docs
Fast Turnaround
Dedicated Expert
Key Dates
Tender timeline
Publish Date Fri 19th June, 2026
Bid Submission Deadline Mon 29th June, 2026
Bid Opening Refer Documents
Documents
Official tender documents
Document NameAction
Tender Notice
FAQs

Sign up, download the bid documents, and submit as per the Key Dates. Need help? Talk to an expert.

Yes—JV MoU, compliance, share matrix, and end-to-end guidance. Start here.

We can help with PQC, technical compliance, and pricing strategies. Enquire now.
Have questions about TKID 20041110?
WhatsApp