Providing Of Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Icgs Vijit; H-839 Gangway Securing Post At Quarter Deck Stbd Side Deteriorated And Ms Channel With Hinges Uprooted To Be Renewed As Per Sample Channel Size 25 X 65 Cm Th..,repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Icgs Vijit; H-841 Drain Strainer Mat Ss And Flexible Pipe Mat Pvc Of Sink In Sick Bay Deteriorated And Strainer Seal Worn To Be Renewed As Per Sample; Service Provider,repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Icgs Vijit; H-843 Securing Clamp Of Vertical Ladder On Mast Area Deteriorated And Affecting Personnel Safety Clamps With Ss Nuts 04 Sets To Be Renewed As Per Sample Mat ..,repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Icgs Vijit; H-844 Operating Handle Dia 45 Cm Mat Ms Thickness 12 Mm Of Asp Hatch Deteriorated And Material Thinned Down Affecting Personnel Safety Operating Handle To Be..