1. Signalling Arrangement In Connection With Provision Of Rub At Sc Division Mtmi-jptn Section:-lc No. 14 (m) At Km 16/3-4 Between Motumari - Makapeta Stations. 2. Signalling Arrangement In Connection With Provision Of Rub At Lc No. 12kk(m) At Km 36/10-11 Between Chimalpahad - Tadikalapudi Stations. Telecom Works:-1)construction Of Rub (subway) At Km 2/11-12 As 1x5.5x4.0m Precast Rcc Box In Lieu Of Lc No.8mb At Km 2/11-12 Between Karepalli-singareni Collieries Railway Stations.2 )construction Of Rub (subway) At Km 6/15-16 As 1x5.5x4.5m Precast Rcc Box In Lieu Of Lc No.9mb At Km 6/13-14 Between Karepalli-singareni. 3) Construction Of Rub (subway) At Km 9/11-12 As 1x5.5x5m Precast Rcc Box In Lieu Of Lc No.10mb At Km 9/11-12 Between Karepally-singareni Road Stationscollieries Railway Stations. 4) Construction Of Rub (subway) At Km 4/1-2 As 1x5.5x5.0m Precast Rcc Box In Lieu Of Lc No.05 E At Km 4/2-3 Between Motumarri-makkapeta Stations. 5)construction Of Rub (subway) At Km 36/11-12 As 1x5.5x4.5m Precast Rcc Box In Lieu Of Lc No.12 Kk At Km 36/11-12 Between Chimal Pahad-tadakalpudi Road Stations. 6)construction Of Rub (subway) At Km 87/9-10 As 1x5.5x4.0m Precast Rcc Box In Lieu Of Lc No.28 At Km 87/9-10 Between Pandurangapuram-manuguru Stations. 7) Proposal For Construction Of Rub (subway) At Km 16/3-4 As 1x5.5x5.0m Precast Rcc Box In Lieu Of Lc No.14 T At Km 16/2-3 Between Motumarri-makkapeta Stns (kanneveedu-penugranchiprolu).8) Construction Of Rub (subway) At Km 13/6-7 As 1x5.5x5.0m Precast Rcc Box In Lieu Of Lc No.11 E At Km 13/6-7 Between Motumarri-makkapeta Road Stations. 9)telecom Arrangements In Connection Construction Of Running Room At Manikgarh Station For Resting Of Running Staff.10)telecom Arrangements In Connection With Construction Of New Running Room At Prpi For Resting Of Running Staff.