Supply Of Surface Dressing Not Exceeding 15 Cm Deep In Soft Loose Soil Completel All As Specified And As Directed,cleaning Of Grass Vegetation Sapling Shurbs Bush Wood Under Growth And Tree Not Exceeding 30cm Qirth Measured 1m Above Ground Level And Rernoving Rubbish Upto A Distance Of 50 M,excavating In Trenches Not Exceeding 1 Point 50 M Wide And Not Exceeding 1 Point 50 M In Depth For Foundation Etc And Getting Out In Soft Loose Soil,filling In Foundation Trenches And Plinth With Excavated Earth Including Laying The Earth In Layers Not Exceeding 23 Point 5 Cm Thick Ramming And Watering With All Leads,supplying And Filling In Foundation And Plinth With Good Quality River Sand Including Watering Ramming With Cost Conveyances Royalties Of All Materials And Cost Of All Labour,providing And Applying Of Pre Constructional Anti Termite Treatment By Drilling 12mm Dia Holes At Distance Of 30cm Junction Of Wall And Floor About 300mm Apart Deep Enough To Reach The Soil Below,m And L Cement Concrete 1 4 8 Type D 2 Using 40mm Gr