Supply Of Mobilzation Transportation Erection And Dismantling Of All Required Equipment As Per Specification Attached,carrying Out Soil Investigation In 150mm Dia Bore Hole Minimum Upto 10m Depth As Per Relevant Is Codes Complete All As Specified And Directed,carrying Out Following Laboratory Tests On The Soil Samples As Per Is Codes Seive Analysis And Hydrometer Tests On Soil Properties Liquification Analysis Etc As Per Specification Attached,preparation Of Report As Per Relevant Is Code And Test Result Submission Of All Report Booklets Five Copies With Cd 01 Copy As Per Specification Attached,evaluation Of Safe Bearing Capacity Of The Soil Minimum Depth Of Foundation To Be Adopted Soil Treatment Below Foundation As Per Specification Attached