Composite Work (civil, Electrical General & Ohe) For 1.proposed Construction Of Rob In Lieu Of Lc No. 131 At Km:162/820 With 6x18.71m Psc Girder+1x9.33m Rcc Slab (ariskere )+ 1x36m Composite Girder (railway Span) + 2x18.71m Psc Girder+1x9.33m Rcc Slab (mysuru)+ Cc Block & Retaining Wall (approach Portion) Between Ariskere And Hassan Stations (two Lane)2.proposed Construction Of Rob In Lieu Of Lc.no.123 At Km 205/243 As 3x18.71m Psc Girder(towards Kadur End) +2x12m Rcc Slab +1x42 Clear Span Composite Steel Girder As Railway Span + 1x10.5m Rcc Slab+6x18.71m Psc Girder (to Bengaluru-shivamogga Road)+retaining Wall For Approaches Between Kadur-birur Stations (two Lane)3.proposed Construction Of Rub In Lieu Of Lc No.47 At Km:61/659 As 1x7.50mx4.50m Rcc Box Between Shivamogga And Shivamogga Town Stations By Launching Method Using Temporary Girder & Cast In Situ Method.4.proposed Construction Of Rob In Lieu Of Lc No. 20 @ Km:25/439 As 1x18.71m Psc Girder + 1x36 M Composite Girder + 1 X 10.50m Slab (nh 766 End) + 1x36 M Composite Girder(railway Portion) + 5x18.71m Psc Girder (nanjungud Temple End)+ Rcc Retaining Wall (both Approach Portion) And Proposed Limited Height Subway At Km:25/495 As 1x5x2.5m Rcc Box Between Nanjangud And Chamrajnagar Stations.5.proposed Construction Of Rob In Lieu Of Lc No. 55 At Km:59/752 With 4x18.71m Psc Girder (towards Akkihebbalu Road End)+1x36m Composite Girder(railway Span)+5x18.71m Psc Girder (to Chandagonahalli End)+ Rcc Retaining Wall + Re Blocks (approach Portion) Between Akkihebbalu And Mandagere Station.