Tender Details — Supply Of Smart Energy Meters With Head End System Services In G...

GOVERNMENT OF GUJARAT • Gandhinagar, Gujarat

WhatsApp
Overview 2w and 5d from now left
High-level tender details
Tender AuthorityGOVERNMENT OF GUJARAT
LocationGandhinagar, Gujarat
Estimated Value₹ 16,608,500.00
EMD₹ 332,000.00
Document Cost₹ 10,000.00
Need a JV Partner?
Tender Description

Supply Of Smart Energy Meters With Head End System Services In Gift City

Premium JV Support
Only 20 days left to bid
JV for this Tender

Faster paperwork • Compliant docs • Right partners

Compact JV pack: MoU + compliance + roles + timelines — delivered against your bid deadline.

Custom JV Agreement & MoU
PQC & compliance paperwork
Workshare & risk allocation
Fast turnaround
We align delivery to your deadline (09-Jun-2026).
JV Essentials Checklist
  • Lead & Partner credentials (experience, turnover)
  • Profit share / Workshare matrix
  • Board/Partner resolutions & authorizations
  • JV Agreement / MoU (stamp & notarization)
  • Bid-specific annexures & declarations
Compliant Docs
Fast Turnaround
Dedicated Expert
Items Total Items : 3 | Total Qty : 2300
List of items to be supplied
Sr. NoItem DescriptionQtyUnit
1 1200009630: 1P2W 240V 10-60A CL-1.0 SMART METERDesign, engineering, manufacturing, inspection & testing at manufacturers works before dispatch, supply and delivery at destination (at GIFT store) of AC whole current 1 phase 2 wire, ISI Marked, 1.0 Class Accuracy, 10-60 A Smart Energy Meter with DLMS protocol & bidirectional communication facility & remote connect/disconnect switch. The meter shall communicate with Head End System (HES) on any one of the communication technologies mentioned in IS:16444 Part 1 compliant with NBIoT communication module fall back to 2G, as per the requirement of the utility for measurement of import and export active energy (kWh) with initial and sustained accuracy of class 1.0 for solidly earthed system with balanced and unbalanced loads having power factor in the range of zero to unity (Lagging/Leading). The meter shall be compatible to common meter reading instruments and other associated instruments & software for remote reading as per requirements given in this specification 1000.000 EA
2 1200009631: 3P4W 240V 10-100A CL1.0 WC SMART METERDesign, engineering, manufacturing, inspection & testing at manufacturers works before dispatch, supply and delivery at destination (at GIFT store) of AC whole current 3 phase 4 wire, ISI Marked, 1.0 Class Accuracy, 10-100 A Smart Energy Meter with DLMS protocol & bidirectional communication facility & remote connect/disconnect switch. The meter shall communicate with Head End System (HES) on any one of the communication technologies mentioned in IS:16444 Part 1 compliant with NBIoT communication module fall back to 2G, as per the requirement of the utility for measurement of import and export active energy (kWh) with initial and sustained accuracy of class 1.0 for solidly earthed system with balanced and unbalanced loads having power factor in the range of zero to unity (Lagging/Leading). The meter shall be compatible to common meter reading instruments and other associated instruments & software for remote reading as per requirements given in this specification 1200.000 EA
3 1200009632: 3P4W 240V -/5A CL0.5s CT SMART METERDesign, engineering, manufacturing, inspection & testing at manufacturers works before dispatch, supply and delivery at destination (at GIFT store) of 3 phase 4 wire, ISI Marked, 0.5s Class Accuracy, fully Static LT Current Transformer (CT) operated Smart Energy Meter with DLMS protocol & bidirectional communication facility. The meter shall communicate with Head End System (HES) on any one of the communication technologies mentioned in IS:16444 Part 2 compliant with NBIoT communication module fall back to 2G, as per the requirement of the utility for measurement of import and export active energy (kWh) with initial and sustained accuracy of class 0.5s for solidly earthed system with balanced and unbalanced loads having power factor in the range of zero to unity (Lagging/Leading). The meter shall be compatible to common meter reading instruments and other associated instruments & software for remote reading as per requirements given in this specification 100.000 EA
View more BOQ items
Key Dates
Tender timeline
Publish Date Tue 19th May, 2026
Bid Submission Deadline Tue 9th June, 2026
Bid Opening Refer Documents
Documents
Official tender documents
Document NameAction
Tender Notice
FAQs

Sign up, download the bid documents, and submit as per the Key Dates. Need help? Talk to an expert.

Yes—JV MoU, compliance, share matrix, and end-to-end guidance. Start here.

We can help with PQC, technical compliance, and pricing strategies. Enquire now.
Have questions about TKID 19643440?
WhatsApp