[i] Sbc-jtj Section: Proposed Construction Of Rub At Trespassing Location At Km 339/300-400 Between Hdih-kjm Stations In Aden/sbc Sub-division- Trd Works[ii] Sbc-jtj Section: Proposed Construction Of Pedestrian Subway At Km.230/000-100 Between Pu-mar Stations In Aden/bwt Sub-division [iii]recoupment Of Ballast At Tss,sp/ssp And Provision Of Cable Trench Covers In Sbc-jtj Section.[iv]bifurcation Of Elementary Section At Skpt Station And Modification Of Umbrella Structures At Ypr Station. [v]provision Of Earthing And Bonds At Ssp/sp,fob And Platform Shelters In Sbc-jtj Section.[vi] Kjm-augmentation Of Kjm Shed For Increasing Homing Capacity From 175 To 300 Electric Locomotives-detailed Estimate. [vii]ohe Modifications In Connection With Construction Of New Ac Loco Trip Shed At Ypr. [viii] Ynk-bwt Section: Proposed An Approach Road On Lh Side In Rub 85a At Km 96/200-300 Between Cmy-svs Stations [ix] Ohe Modifications In Connection With Construction Of Ac Loco Trip Shed At Smvb.