[i]ohe Modification Required For Construction Of Track Machine Siding At Baw, Yy, Sbga And Nmga Station Length Of 420m [ii]ohe Modification In Connection With The Proposed Extension Of Platform Bgnr Pf-1&2 By 16 Mtr, Hise Pf-1, 2&3 By 20 Mtr, Sbga Pf-1, Pf-2&3 By 138m Each, Cnpa Pf-1, 2&3 By 140 Mtr And Compound Wall At Cnpa Station In Aden/kigl Subdivision. [iii]trd Works In Connection With Engineering Track Works In Baw- Has Section. [iv] Ohe Modifications In Connection With Proposed Construction Of Rub (rcc Box Size-15x4.5m) At Km 14/300-400 At Nmga Station.[v] Ohe Modification In Connection With Provision Of Additional Loop Line At Siga.[vi] Recoupment Of Ballast At Tss,sp/ssp And Provisonof Cable Trench Covers In Baw-has Section.[vii]ohe Modification In Connecton With Provision Of Goods Loop (proposed Rd-04) With Csl Of 720m And Rail Level Platform Of 700x20m For Goods And Handaling Facility At Cnpa Station.