Description : Construction Of Rgca Campus, Karaimedu At Sirkazhi Sh: 1.development Of Existing Internal Roads And Constrcution Of Patrol Road, Street Lighting Alobg The Compound Wall 2.construction Of Additional Substation Building 3. Supplying, Installation, Testing And Commissioing Of 1 No.additional 630kva Transformer And 1 No. Additional 500 Kva Dg Set. 4. Construction Of Four Wheeler And Two Wheeler Parking Shed 5. Supplying, Installtion, Testing And Commissioning Of 2 Nos 75 Kva Static Stabilizer, 1 No 200 Kva 2 X 100kva Parallel Redundant Ups System And 55 Nos Additonal Spilt Type Ac Units Along With Stablizer And Associated Cabling, Etc In The Upcoming Pathogen Screening Laboratory. Sh: Balance Works Of Substation Building. Civil And Electrical |